Commercial HVAC Case Study: Church to Med Spa in Fort Lauderdale
Three rooftop units on the roof. Only two needed.
A church in Fort Lauderdale moved out. A medical spa was moving in, with laser treatment rooms, massage and waxing, all inside the same 2,400 sq ft tenant space, and it needed a med spa HVAC design that fit the new use.
The roof already had three 5-ton rooftop units. The easy move would have been to keep all three running and call it done. Instead, the architect brought us in to size the HVAC for the new layout.
Our room-by-room load calculation showed that two of the existing units could carry the full cooling and heating load. Here’s how we got there, and what it means for anyone planning a tenant remodel in Florida.
Project snapshot
| Location | Fort Lauderdale, FL (climate zone 1A) |
| Project type | Tenant remodel: church space to medical spa |
| Conditioned area | 2,400 sq ft, split into two zones (1,180 and 1,222 sq ft) |
| Use | Laser treatment rooms, massage, waxing, reception |
| Occupancy | 18 to 20 people |
| Existing equipment | Three 5-ton rooftop units |
| Result | Two of the three units cover the full load |
| Client | An architecture firm in South Florida |
| Turnaround | About a week from kickoff to signed package |
The med spa HVAC design challenge
A church and a med spa use a building in very different ways. A church fills up for services and events. A med spa runs all day, with small treatment rooms full of people, lasers and other equipment that put off heat.
The existing equipment came with the space, not with the new floor plan. Nobody knew if it fit the new use. Keeping all three units would mean paying to run and maintain a unit the space might not need. Guessing low could leave treatment rooms warm and sticky.
Then there’s South Florida. Our design conditions were 88°F outdoors with a 76°F wet bulb, holding 75°F and 50% relative humidity inside. In this climate, getting moisture out of the air matters as much as getting the temperature down.
Before starting, our designer confirmed three things with the architect:
- What kind of spa it was. An aesthetic spa with medical treatments such as laser in the back rooms, plus massage and waxing.
- Window values. The windows and doors were existing and staying, so we used their existing values.
- Occupancy. 18 to 20 people at a time.
What the load calculation showed
The whole space needs about 76,400 Btuh of cooling at design conditions, roughly 6.4 tons. We split it into two zones, each served by one existing 5-ton unit.
| Zone | Area (sq ft) | Sensible cooling (Btuh) | Latent cooling (Btuh) | Heating (Btuh) | Unit cooling capacity (Btuh) |
|---|---|---|---|---|---|
| Zone 1 | 1,180 | 25,000 | 10,103 | 14,626 | 55,300 |
| Zone 2 | 1,222 | 28,835 | 12,453 | 16,584 | 55,300 |
That left the third unit with nothing to do. Two findings stood out.
People and equipment drive the heat. Internal gains made up about half of each zone’s sensible cooling load (51% in zone 1, 50% in zone 2). Windows came next, at about 22% in both zones. For a med spa, the treatment rooms matter more than the building shell.
Fresh air drives the moisture. About 72% of the latent load came from the outside air the building needs for ventilation. Each unit’s outside air damper is set to a specific value (185 cfm and 264 cfm), so the system brings in the fresh air the space needs and no more humid air than that.
Our med spa HVAC design
With the load settled, we built the med spa HVAC design around what was already there.
- Two existing rooftop units, one per zone. Each delivers 1,800 cfm and about 55,300 Btuh of cooling.
- Duct design per ACCA Manual D. Supply branches are sized to each room’s load, and existing ductwork and grilles stay in place where they work.
- Set outside air. Damper settings of 185 cfm and 264 cfm, with a motorized damper added if a unit doesn’t have one.
- Treatment room exhaust. A dedicated exhaust for one treatment room, vented through the roof.
- Better filtration. MERV 11 pleated filters at every return grille.
- Energy code compliance. A COMcheck report under ASHRAE 90.1 (2019) for the alteration. The envelope passed.
The package went out as signed mechanical drawings, load calculations, duct design and the COMcheck report.
About a week, three reviews
The project went from kickoff to a signed package in about a week. Every stage got a second set of eyes before it moved on.
- Kickoff. Our designer reviews the plans and sends the architect a short list of questions.
- Answers in. The architect confirms spa type, windows and occupancy.
- Load and equipment review. Load calculations and equipment selection get an internal check. We tell the architect two units will do the job.
- Duct review. The duct design gets its own internal check.
- Final review. One last check, then signed drawings and the COMcheck report go out.
Fast doesn’t mean rushed. Each review caught comments that went back to the designer before the next step.
Med spa HVAC design lessons for your next tenant remodel
Don’t assume the existing equipment is right. It came with the space, not with your floor plan. Sometimes it’s too small. Here it was more than the space needed.
Find out how the space will really be used. A med spa, a dental office and a retail shop in the same footprint can have very different loads. Three quick questions up front shaped the load calculation.
In Florida, plan for moisture, not just heat. Most of this project’s latent load came from fresh air. Getting outside air settings right is what keeps treatment rooms comfortable.
Reuse what works. Keeping the existing units, ducts and grilles where they fit kept the scope tight, and the load calc showed the owner doesn’t need a third unit running.
Want to check your own project first? See our guides on commercial HVAC permit requirements and red flags of an oversized system.
Planning a tenant remodel?
Need med spa HVAC design, or working on a clinic, office or retail space? We can tell you what your existing equipment can handle before anyone orders new units. We work with contractors, architects and builders across Florida and all 50 states.